- HR3 Manual
- HMI Interface and Connectivity Manual
- Liquefiers (A B) Manual
- Purifier Manual
- QT System P&ID Information
- Coldhead Compressors Manual
- HMI Cabinet Manual
- Pneumatic Air Supply Manual
Operational Configuration (←Click)
Routine Maintenance Procedures
Purpose | Instructions/Links |
---|---|
Cleaning (Liquefier) | |
Cleaning (Purifier) | |
Cleaning (HR3 piping) | Purging HR3 after a maintenance |
Cleaning the buffer tank | Cleaning the Buffer Tank on the Cryoplatform |
Cleaning the filters F1, F2, F3, and the filter before MV101 | Cleaning the filters F1, F2 at HR3 Cleaning the filter at MV101 |
Fills | Filling LN2 to the purifier using the outside LN2 tank |
Taking purity measurements at various places in the system |
General/Other Procedures
Purpose | Instructions/Links |
---|---|
System Startup Procedure | |
Cooldown | |
For planned power outage | |
Taking purity measurements at various places in the system |
Troubleshoots
Issue | Reason | What to do? |
---|---|---|
If the Dewar level indicators have large fluctuations | Level sensor tubes are contaminated | Fixing dewar level indicator FNAL Approved procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10401 |
Coldheads blocking alarm | Possible contamination or cold heads have been running so long without any intake gHe for a while | |