The HR3 is the cryogenic system recovery compressor and collects helium from the liquefier dewars, the roots pump, and the superconducting magnet and compresses it, and sends it to the two storage tanks outside.
Manuals from QT:
There are three main components of the HR3 compressor:
1. QT portion (on top of Kaeser)
2. HR3 PLC Screen
3. Kaeser Compressor
1. QT portion of the HR3
Valve | Functionality |
---|---|
REGP | Regulate the gHe pressure (indicated by P10) from the tanks outside |
P10 | Pressure indicator: shows the regulated pressure from the outside gHe tank |
V30 | Controls gHe inlet to the purifier (There is a solenoid valve after this hand valve "V9a" should be opened from QT-HMI screen if you want to let gHe flow-in to the purifier) |
V35 | Controls gHe outlet from the purifier (There is a solenoid valve after this hand valve "V21a" should be opened from QT-HMI screen if you want to let gHe flow-out from the purifier) |
P41 | Pressure transducer (connected to a manual gauge at the HR3 front panel): shows the inlet pressure to the purifier (should be equal to P10 if V30 is open) |
P40 | Pressure transducer (connected to a manual gauge at the HR3 front panel): shows the outlet pressure from the purifier (if |P41 - P40| > 40 psig, then it is an indication that the purifier needs regeneration) |
V36 | An isolation valve between the inlet-side and outlet-side of the purifier |
V17A | A bleeder valve to bleed gHe from the outlet (return) side of the gHe tank which includes the spaces : Buffer tank, filters F1, F2, F3 upstream to the compressor's outlet |
V14 | An isolation valve for the buffer tank from the outside tank |
SV7 | A solenoid valve is controlled by the HR3 PLC Screen on the upper-front section of the HR3. Operational settings: Closing at 70 psig, Opening at 90 psig. |
HR3 control box: normal operation configuration (06/16/2023)
Normally opereration mode (06/16/2023)
Valve | State |
---|---|
Vliq1 | Open |
V19 | Closed |
Vliq2 | Closed |
V18 | This is a 3-way hand valve: position→ gas flow downwards |
VEVAC | Close |
V30 | Open |
V35 | Open |
VP | Close |
V36 | Close |
REGP | Open (fully) |
V11 | Open |
Vs4 | Close |
Vfill | Close |
Vmup | Close |
V17 | Close |
V14 | Open |
NV2 | Close |
SVPD | Always open (relay was taken out) |
V12 | Close |
V13 | Close |
VDepr | Close |
FI01 | Completely Opened |
FI02 | Open (somewhere in the middle) |
FI03 | Completely Closed |
MV101-He | Open (from tank) |
MV1020-He | Open (to tank) |
MV103-He | Close |
The MV1 valve which is a red box in the back of HR3 will start blinking and close the main recovery path and then it forces helium gas through REG4 (making the horn sound). Closing this valve increases the pressure in the recovery manifold so that PC1 with a spike (usually just to 2 psi or so but less than 4 psi). Building pressure in this space pushes helium to the buffer tank through REG4 and REG3.
Functionality of the cycles in HR3
1. VM1 (red-box valve):
* Controls inlet gHe to the Kaeser Compressor
* Closes if there is no pressure rise of '1 psi' (can be changed on the HR3 PLC Screen) in the buffer tank between the sample time period (there are two parameters: sample time period (mins), sample spacing (mins))
* Has a switch to change its mode to "MANUAL" mode which
2. SV7:
* There are two threshold values: closing-threshold and opening-threshold that can be set via the HR3 PLC Screen
* Operating closing-threshold is 70 psi
* Operating opening-threshold is 90 psi
* There is a check-valve of 50psig bypassing this SV7 (i.e. if the Buffer Tank pressure (PSW4) > 50 psig, then it stays open to the outside tank regardless of the SV7 state until Buffer tank pressure (PSW4) < 50sig)
* There is a setting called "SV7 stays closed when compressor idle" which couples to the Kaeser cycles (IDLE → LOAD → STANDSTILL ).
If it is "YES" (which seems to be the default): then SV7 is OPEN when the Kaeser Compressor is in the "LOAD" state (is shown as a dark arrow (left-to-right))
If it is "NO": then SV7 is OPEN when the Kaeser Compressor is in the "IDLE" state (is shown as a hollow arrow (left-to-right).
3. Kaeser Compressor (reference Kaeser 9_5869_33 USE SM Operating Manual.pdf):
* Has two control modes "DUAL" and "QUADRO" (see Section 4.4.2 page 26 on the Kaeser 9_5869_33 USE SM Operating Manual.pdf)
* DUAL: Switch between LOAD (when it reaches preset-minimum), and IDLE (when it reaches preset-maximum). When the preset Idling time has elapsed, the machine switches to READY/STANDSTILL mode.
* QUADRO: Switch between LOAD and READY/STANDSTILL after short periods of being IDLE.
Following extended times in various operating modes, the machine switches from LOAD to READY/STANDSTILL. The time in LOAD and IDLE operating modes are taken as minimum runtime.
Recursive cycles in fault mode:
The Kaeser seems to have its own internal logic that is independent of the top QT ladder logic. The Kaeser run time is regulated by this internal logic under two modes Dual and Quadro. Quadro is the default mode (so anytime we lose power it will like come back in Quadro). The internal timing of these cycles is supposed to be settable in Quadro through the Kaeser interface but we could not find out how to do that. In Dual it's fixed. The HR3 part above the Kasser is also in 'idle' when not under load. It is in idle most of the time that we tried things no matter what the flow was.
When monitoring the reliving cycle on the QT part we noticed that SV7 appears to open only when there is a load (black arrow in Kaeser screen) for a very short time relieving pressure on the buffer tank and then returns to idle (white arrow in Kaeser screen). We then changed the 'Edit SV7 idle behavior' on the HR3 screen to "SV7 stays closed when the compressor is in idle: NO". The default here is YES.
When this was done and the relay RL1 had the lever flip, the Kaeser relieving cycle that releases helium from the oil separator quit relieving. The other horn-sounding cycle on the HR3 continued but that one does not release any gHe so not a big concern that we know of.
We also switched the Kaeser from the default mode (Quadro) to the Dual. When we did this and switched the RL1 lever down the Kaeser relieving cycles also quit relieving. This is how we are running now, "Dual" with "SV7 stays closed when the compressor is in idle: NO".
For the last 30 hours, HR3 seems to be running stably but it's not fixed. The repetitive horn-sounding cycles are happening about every 2-4 minutes. This does not seem to be harmful but it's not normal and an indication that something is wrong in the HR3 logic, or there is a bad sensor as part of the logic or some other issue that this cycle is trying to accommodate for by closing the main recovery flow path.
When we actually started trying to liquefy HR3 started running normally on its own. There may or may not be a correlation.
Kaeser Compressor
Kaeser Compressor Display (Click this link to see images)
Kaeser Compressor Maintenance
There is a 155 psi relief valve
Standard Air Filter on the Inlet of the gHe tank in the NM4 Hall
We tapped video on October 31, 2023, to demonstrate how to bleed it.
F3 (Blue Canister) of the HR3 Compressor
A log of changes
Date | Change |
---|---|
| HR3 upper threshold was changed to 145 psi. |