You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

  1. Check the outside gHe pressure and make sure it is below 90 psi. If it's equal, near or above, then relief it's pressure down to ~80 psi.
  2. Check with Target Expert on Shift whether the REGX green hand valve is fixed to some pressure during the previous fill.
  3. Set the liquefier to "Manual" mode.
  4. Navigate to the liquefier page on the HMI screen.
  5. Open SVP(A/B)
  6. Navigate back to the "Overview Screen".
  7. Start pre-cool phase:  Open VPC → Open VJV(A/B) → Monitor TX1, TX2, TX3
  8. After ~8mins: Open magnet-bypass (hand-valve right next to the magnet flow controller) → Open VJVT on the HMI screen.
  9. After ~1min: Close VPC and monitor magnet pressure.
    *****************************************************************************************************************************************
    ** Note: If the REGX green hand valve is fixed (check with Target Expert on Shift), then do not change it: just proceed with step #10 *****
    *****************************************************************************************************************************************
    > If you need to change the pressure difference between the magnet and the Dewar then use the REGX all the time to maintain the pressure difference that you need (eg: ~4psi)
  10. After a couple of minutes, you will observe that the magnet pressure drops down suddenly and stay around ~1.4-1.5 psi (this indicates that LHe is flowing to the magnet after the pre-cooling of the last part of the transfer line).
  11. Fill the magnet until the level shows ~44% → Open VPC → Close VJVT → Close VJV(A/B) → Close Magnet bypass hand valve. Make sure that you leave the VPC open to capture all the boil-off from the transfer line until it is warm (check TX1).
  12. Navigate to the liquefier page on the HMI screen and close SVP(A/B) → Switch the Liquefier to "Liquefy mode".
  • No labels