...
- Close MV103
- Purge from MV101
- Connect a oil pump to the buffer tank
- Connect He bottle to Helium purge Inlet
- Open the He bottle to 10 psig
- Open the valve on the buffer tank and start vaccum
- Monitor the pressure on the buffer tank and let it go up to ~ 0.2 psi
- Close Vfill and pump the lines and monitor the buffer tank pressure to go up to 0.2 psig
- Pump back the lines by opening Vfill and monitor the buffer tank pressure to go up to ~ 10 psi
- Do the pump and purging for 3 cycles
Steps for pump and purge:
- Close the hand valve from the pump
- Set the He gas cylinder to 10 psig
- Open VFill slightly
- Open the yellow color hand valve L7B while watching the gauge
- Once it's pressuresized (check pressure from the pump) close Vfill and L7B
- Close VBTv on the buffer tank
- Disconnect the line from the pump and connect to the purity meter
- Crack open VBTv and check the purity
- Open L7B and disconnect the purity meter