- Shut Down and Restart Procedures
- Helium Liquefier (QT) System Summary
- How to fill LN2 to the Purifier and Magnet LN2 spaces
- How to fix the QT-HMI if its screen got frozen
- Fixing dewar level indicator
- How to restart the QT PLC
- How to fix if the outlet flows of Liquefiers are showing strange values
- HR3 operations
- Filling LN2 to the purifier using a portable Dewar
- QT System Starting Procedure
- Liquefier Cleaning when Dewar contains LHe
- Cleaning QT purifier Helium-space (pumping-purging the purifier). Cleaning QT purifier Helium-space (OLD)
- Cleaning QT purifier LN2 space
- Fixing dewar level indicator (related to (9))
- Dewar Cleaning Procedure (using the transfer line)
- Cold-helium Circulation Procedure (Cooldown Transferline)
- Cleaning gHe outside tank using the purifier
- Resolving Liquefier Blocking Alarm when Liquefier is on Liquefy Mode
- Resolving Liquefier Blocking Alarm when Liquefier is on Idle Mode
- Purifier LN2 Fill Procedure-updated-labels.pdf ( Please use this updated one, or the original one on docdb 10337 by Jordan Bohn)
...
- The volume of an outside gHe tank: 1600 cubic feet (V = 45306.95 L)
1 psi of gHe at 300 K in the outside gHe tank = 4.1 L of LHe — R_gL = 4.1 L/psi at 300 K
P_atm = 14.7 psia - C_gL = 750 — 1 L of LHe = 750 L of gHe @ 300 K, 1 atm
- P_gHe ~ 100 psig (not psia)
- L_LHe = V * (P_gHe + P_ATM) / P_ATM / C_gL
- R_gL = L_LHe / (P_gHe + P_atm) = V / P_ATM / C_gL = 4.1 L/psi
- The pressure increase in the gHe tank per tube (in the tube trailer) is 10psi (i.e. 10 psi difference per tube)
- 100 slm rate on Magnet FC is equivalent to ~ 192 LHe liters per day (i.e. assuming both LQ A and B are running)
- QT recommendation to keep system minimally pressurized: ~20 psi
- Running from 40 psi down to 20 psi would produce about 80 liquid litters and we should be able to do that in about 10 hours (assuming both LQ A and B are running).
- Putting a 2200 psi gas bottle into the system will produce 8 liquid liters per bottle.
- HR3.docx (It's a copyright of QT-technology. Please do not make it public. )
...
To check LCW parameters: https://e906-gat1.fnal.gov/data-summary/e1039/slow-cont-acnet.php
(click on NM4LCW or select )
QT LCW requires are 7.8kW of cooling per coldhead compressor, will less than 77F on water inlet and at least 6L/min of flow.
To check HMI parameters: https://e906-gat1.fnal.gov/data-summary/e1039/target-QT-HMI.php (select:
...