QT Dewar level: Liq B = Warm, pumped, and purged. Flushed out level sensors.
- [MV02 should be set to restrict flow to allow only 100 ~60 SLM; if it is, then the pressure should be able to be regulated in the dewar].. If you cannot adjust that due to NM4 hall restriction due to beam operations, skip step 2.
- The inlet flow should be around 60 slm, and the outlet should be 60 slm. At the beginning of the dewar A/B cooldown, open VJVA/B and VPC ahead of time.
- Dewar setting should be on AUTO+Liquefy mode. The entire flow should be going out through VPC. You can monitor this flow by looking at FMR.
...
6. Monitor the dewar temperature as it drops to 7 K. [TIDA/B]. Once it get to around 10K reduce the outlet flow. Once the level starts to fluctuate between 0.2 and 1.9L liquid is starting to accumulate [I need to take pictures of the strip charts, which should show showing 7K and the liquefier level starting to fluctuate.]
7. Then, The final step is to set the outlet flow at 2slm to let it start to liquefy over the next several hours. Every few hours you should check on it and see that the production rate is making sense (should be close to 4L/h).