Please keep a running tab of all polarized target work to do in the foreseeable future. Lets keep things moving and make the most of our time at Fermilab. Anyone can add tasks here. Once a task is complete please comment on its completion and leave enough information for someone else to find the item, continue the work, or know the situation status. When possible make an entry in the ECL logbook about that task being complete with the nessisary details. If you purchased and received the item post here where it can be found.
Do Immediately | Additional Information | Task Finished Result | Person of task |
---|---|---|---|
Fridge sensors | 1KOhm Ruthenium Oxide | ||
Preparation for the dock survey | setup tooling table and position magnet and detail survey layout with crew | http://dbweb5.fnal.gov:8080/ECL/spin_quest/E/show?e=359 | |
Determine and measure true path for all cables coming from target cave and order all cable needed | Front Penetration → Racks on Cryo platform → Counting House Side Penetration → Racks on Cryo platform → Counting House | ||
Replace Black BUNA-N O-rings | Measure existing O-rings and find PTFE (Teflon) equivalents
| ||
After replacing seals setup safety walk through with | Setup Operational Readiness Clearance (through Rick) | ||
Buy a flaring tool for copper tubing | |||
Assemble and test microwave system | Needs to be shipped from UVa - 7/17/19 Borrow gore cable from UVa Need waveguide too | ||
Get Liverpool NMR Q-meter (and ancillary equipment) from LANL | |||
Setup temp full microwave system for testing here | |||
Setup sensors on stick | Check with lakeshore | ||
Stink test in the target loading area | with "special" spray | ||
Setup and test manometer | |||
Setup external magnet sensors with data going into slow controls data stream | |||
Shim Microwave actuator bushings for hard stop and top target. Microwave table and magnet should be in place and use the information from initial survey to measure | |||
Setup LANL NMR system for testing in counting house target area | |||
Setup UVA NMR system for testing in counting house target area | |||
Make material filling station | tub and accessories for fill the target insert | ||
Finalize microwave control system with stepper motor | |||
Setup actuator with potentiometer and controls |
Things to do when not working on the immediate things | Additional Information | |||
---|---|---|---|---|
Setup Polarized Target Drone | Drone to control instide the cave | |||
Setup Target Rack | Stepper motor drives and power supplies ADC for position readbacks Microwave EIP Lakeshore 218 x2 Level Probe Readout Turbo readout and Controller IV gauge readout Teledyne Hastings readout 4He & 3He manometers Possibly Microwave Power Supply Target Insert Lakeshore Fridge Lakeshore External Magnet Lakeshore
| |||
Get hoses for microwave (EIO) | Either hard plastic or rubber | |||
Target Controls Computer | Josh will find it | |||
All cabling from target to racks and counting house | need lengths and to order cables | |||
setup target operator station | ||||
setup target loading station | ||||
Finalize NMR | testing still needed | |||
Target handler and alarm system | ||||
Setup NMR VI | ||||
Annealing controls | ||||
Setup and test Main Gate Valve | ||||
Test Air-core cable with EIP/microwave | ||||
Setup Insert and leak check and electronics check, sensors, coils, SMA | ||||
Setup Nuc and oscilloscope and PDP | ||||
Setup Roots stack controller and power | ||||
Get some plastic tubs and foam dewarsdewars: transfer, storage, insert |