Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. DocDB reference printed on the first page
  2. Author and date on the first page
  3. Revision History table containing the following:
    • Date of revision
    • Revision No. 
    • Name of the person revising the document
    • What has changed from the last version
  4. Table of *all* relevant valve positions at the start of the procedure and the end of the procedure
  5. Give reference to a P&ID, If necessary, in a procedure.
  6. Attach pictures relevant,  If necessary, to a procedure. 


If the following limits are exceeded, then we will need an engineering note

Lowest Possible Temperature in procedures = -20 F
The lower bound for the pressure  = 15 psig
https://www.engineersedge.com/pressure,045vessel/asme_bpvc_rules_13918.htm

Template to write a procedure: Writing procedure.docx 

...

  1. HA-LN2-Fill-Magnet-Shield-using-portable-dewar_final.docx
  2. HA-QT-Coldheads.docx   and  HA-QT-Coldheads_final.pdf
  3. HA-QT-Purifier.pdf
  4. HA_For_Draining_LCW_at_RootsPumps.pdf
  5. HA-Helium-transfer-from-Commercial-Dewar-in-cave.pdf
  6. HA_LHe_transfer_to_QT_storage_dewars.pdf
  7. HA_Filling_LN2_to_Purifier_with_Portable_Dewar.pdf
  8. HA-Helium-transfer-from-Commercial-Dewar-in-cave_signed.pdf
  9. HA 30341: MFC_SwapOut_QT_outlet.pdf
  10. NMR_cable_installation_HA.pdf
  11. HA: Test of Mass Flow Controller, IMPACT package #30221, PDF
  12. HA: Exchange of two flow controllers on QT manifold (FC501B and FCA), IMPACT package #30801, PDF, (Procedure PDF)

...