- DocDB reference printed on the first page
- Author and date on the first page
- Revision History table containing the following:
- Date of revision
- Revision No.
- Name of the person revising the document
- What has changed from the last version
- Table of *all* relevant valve positions at the start of the procedure and the end of the procedure
- Give reference to a P&ID, If necessary, in a procedure.
- Attach pictures relevant, If necessary, to a procedure.
If the following limits are exceeded, then we will need an engineering note
Lowest Possible Temperature in procedures = -20 F
The lower bound for the pressure = 15 psig
https://www.engineersedge.com/pressure,045vessel/asme_bpvc_rules_13918.htm
Template to write a procedure: Writing procedure.docx
...
- HA-LN2-Fill-Magnet-Shield-using-portable-dewar_final.docx
- HA-QT-Coldheads.docx and HA-QT-Coldheads_final.pdf
- HA-QT-Purifier.pdf
- HA_For_Draining_LCW_at_RootsPumps.pdf
- HA-Helium-transfer-from-Commercial-Dewar-in-cave.pdf
- HA_LHe_transfer_to_QT_storage_dewars.pdf
- HA_Filling_LN2_to_Purifier_with_Portable_Dewar.pdf
- HA-Helium-transfer-from-Commercial-Dewar-in-cave_signed.pdf
- HA 30341: MFC_SwapOut_QT_outlet.pdf
- NMR_cable_installation_HA.pdf
- HA: Test of Mass Flow Controller, IMPACT package #30221, PDF
- HA: Exchange of two flow controllers on QT manifold (FC501B and FCA), IMPACT package #30801, not yet approved PDF, (Procedure PDF)
Link to IMPACT-tool: https://www-esh.fnal.gov/pls/apex/f?p=129:1:12952119108779::::: View file name Target_HA_ORC_Procedures.pdf height 250
...