Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

This template refers to the recommendations from Rick, and he wants from us to write a procedure in this way. Please keep in mind while writing a procedure:

  1. DocDB reference printed on the first page
  2. Author and date on the first page
  3. Revision History table containing the following:
    • Date of revision
    • Revision No. 
    • Name of the person revising the document
    • What has changed from the last version
  4. Table of *all* relevant valve positions at the start of the procedure and the end of the procedure
  5. Give reference to a P&ID, If necessary, in a procedure.
  6. Attach pictures relevant,  If necessary, to a procedure. 


If the following limits are exceeded, then we will need an engineering note

Lowest Possible Temperature in procedures = -20 F
The lower bound for the pressure  = 15 psig
https://www.engineersedge.com/pressure,045vessel/asme_bpvc_rules_13918.htm

Template to write a procedure: Writing procedure.docx 

Link to IMPACT-tool: https://www-esh.fnal.gov/pls/apex/f?p=129:1:12952119108779:::::

...

  1. HA-LN2-Fill-Magnet-Shield-using-portable-dewar_final.docx
  2. HA-QT-Coldheads.docx   and  HA-QT-Coldheads_final.pdf
  3. HA-QT-Purifier.pdf
  4. HA_For_Draining_LCW_at_RootsPumps.pdf
  5. HA-Helium-transfer-from-Commercial-Dewar-in-cave.pdf
  6. HA_LHe_transfer_to_QT_storage_dewars.pdf
  7. HA_Filling_LN2_to_Purifier_with_Portable_Dewar.pdf
  8. HA-Helium-transfer-from-Commercial-Dewar-in-cave_signed.pdf
  9. HA 30341: MFC_SwapOut_QT_outlet.pdf
  10. NMR_cable_installation_HA.pdf
  11. HA: Test of Mass Flow Controller, IMPACT package #30221, PDF
  12. HA: Exchange of two flow controllers on QT manifold (FC501B and FCA), IMPACT package #30801, not yet approved PDF, (Procedure PDF)



Link to IMPACT-tool: https://www-esh.fnal.gov/pls/apex/f?p=129:1:12952119108779:::::

View file
nameTarget_HA_ORC_Procedures.pdf
height250

...

Please follow the instructions : How to write a an FNAL Procedure

 


Cryogenics on the cryoplatformCryoplatform

1QT Purifier LN2 fill 10337Yes (Jordan)
2QT Liquefier Dewar level cleaning and Dewar cleaning10401In Progress
3Dewar evacuation10178Yes, HA
4Cold-heads warm-swap procedure10378Yes, HA
5Filling Purifier LN2 space using portable LN2 Dewar10053Yes, HA (Jordan)
6LHe transfer to QT storage dewars 10389Yes, HA
7UVA-QT Purifier Helium Space Cleaning Procedure10404Yes
8UVA-QT Purifier LN2 Space Cleaning Procedure 10407Yes
9Helium boiloff capture procedure 10282In Progress
10LHe transfer using commercial LHe Dewar in the cave9670Yes, HA (Rick)
11Installation of a transfer stinger to a Liquid Helium Dewar (generic)10392No





QT System Non-Cryogenics

12QT system startup and shutdown 10364No
13HR3 Compressor Oil, Oil filter replacement10320No





In-cave Cryogenics

14Magnet LHe fill9670Yes, ORC-2056.01
15Magnet shield LN2 fill 10337Yes, (Jordan)
16Fridge LHe fill 10375Yes, ORC-2056.01
17Filling magnet shield with portable LN2 Dewar10053Yes, HA
18Magnet pre-cool 10032Yes, ORC-2056.01
19Magnet cooldown9651Yes, ORC-2056.01
20Magnet operations 10062Yes, ORC-2071
21Magnet fill from commercial LHe Dewar 10056Yes, ORC-2056.01
22Cold LHe Transfer 10395No





Procedures related to gases

23Pumping and purging (generic)10184Yes (Rick)
24Leak checking (generic) 10188Yes (Rick)
25Outside gHe tank refill 10198Yes, (Jordan)
26Manually vented He Gas Storage Tank to the Atmosphere10285No (Sent to Rick)
27Adjusting the Parallel plate valve PSV-401-He10333Yes (Rick)





Turning ON/OFF procedures

28UVA-NMR system shutdown, startup,tuning, and data-taking10367No
29Slow Control System turn on/off10369No
30Annealing System turning on/off10372No
31Microwave system powering up, Operation, and shutting down10387No
32Target lifter system powering up and shutting down procedure 10381No









HDPE Target Material Handling Related (Include Cryogenics)

33Handling Target material CH2/CD2 (HDPE) 10411In Progress
34Filling the portable handheld dewar10358In Progress
35Target material dewar filling from the portable handheld dewar10427In Progress
36Target insert loading/unloading procedure10355In Progress





NH3/ND3 Target Material Handling (Include Cryogenics)

37Handling Target material NH3/ND310360In Progress
38Plans for storage and usage of Ammonia for the target10414In Progress





Other Maitainance / Cable Installation procedures

39Procedure for draining LCW from roots pumps10384Yes, HA (Rick)
40Cleaning Procedure of roots LCW regulator10420No
41Oil refilling/changing for rotary vane pump10422No
42Routing NMR cables 10357Yes, HA





Planning

43A Detailed description of upcoming plan10417In Progress

...