This template refers to the recommendations from Rick, and he wants from us to write a procedure in this way. Please keep in mind while writing a procedure:
- DocDB reference printed on the first page
- Author and date on the first page
- Revision History table containing the following:
- Date of revision
- Revision No.
- Name of the person revising the document
- What has changed from the last version
- Table of *all* relevant valve positions at the start of the procedure and the end of the procedure
- Give reference to a P&ID, If necessary, in a procedure.
- Attach pictures relevant, If necessary, to a procedure.
If the following limits are exceeded, then we will need an engineering note
Lowest Possible Temperature in procedures = -20 F
The lower bound for the pressure = 15 psig
https://www.engineersedge.com/pressure,045vessel/asme_bpvc_rules_13918.htm
Template to write a procedure: Writing procedure.docx
Link to IMPACT-tool: https://www-esh.fnal.gov/pls/apex/f?p=129:1:12952119108779:::::
...
- HA-LN2-Fill-Magnet-Shield-using-portable-dewar_final.docx
- HA-QT-Coldheads.docx and HA-QT-Coldheads_final.pdf
- HA-QT-Purifier.pdf
- HA_For_Draining_LCW_at_RootsPumps.pdf
- HA-Helium-transfer-from-Commercial-Dewar-in-cave.pdf
- HA_LHe_transfer_to_QT_storage_dewars.pdf
- HA_Filling_LN2_to_Purifier_with_Portable_Dewar.pdf
- HA-Helium-transfer-from-Commercial-Dewar-in-cave_signed.pdf
- HA 30341: MFC_SwapOut_QT_outlet.pdf
- NMR_cable_installation_HA.pdf
- HA: Test of Mass Flow Controller, IMPACT package #30221, PDF
- HA: Exchange of two flow controllers on QT manifold (FC501B and FCA), IMPACT package #30801, not yet approved PDF, (Procedure PDF)
Link to IMPACT-tool: https://www-esh.fnal.gov/pls/apex/f?p=129:1:12952119108779::::: View file name Target_HA_ORC_Procedures.pdf height 250
...
Please follow the instructions : How to write a an FNAL Procedure
Cryogenics on the cryoplatformCryoplatform | |||
1 | QT Purifier LN2 fill | 10337 | Yes (Jordan) |
2 | QT Liquefier Dewar level cleaning and Dewar cleaning | 10401 | In Progress |
3 | Dewar evacuation | 10178 | Yes, HA |
4 | Cold-heads warm-swap procedure | 10378 | Yes, HA |
5 | Filling Purifier LN2 space using portable LN2 Dewar | 10053 | Yes, HA (Jordan) |
6 | LHe transfer to QT storage dewars | 10389 | Yes, HA |
7 | UVA-QT Purifier Helium Space Cleaning Procedure | 10404 | Yes |
8 | UVA-QT Purifier LN2 Space Cleaning Procedure | 10407 | Yes |
9 | Helium boiloff capture procedure | 10282 | In Progress |
10 | LHe transfer using commercial LHe Dewar in the cave | 9670 | Yes, HA (Rick) |
11 | Installation of a transfer stinger to a Liquid Helium Dewar (generic) | 10392 | No |
QT System Non-Cryogenics | |||
12 | QT system startup and shutdown | 10364 | No |
13 | HR3 Compressor Oil, Oil filter replacement | 10320 | No |
In-cave Cryogenics | |||
14 | Magnet LHe fill | 9670 | Yes, ORC-2056.01 |
15 | Magnet shield LN2 fill | 10337 | Yes, (Jordan) |
16 | Fridge LHe fill | 10375 | Yes, ORC-2056.01 |
17 | Filling magnet shield with portable LN2 Dewar | 10053 | Yes, HA |
18 | Magnet pre-cool | 10032 | Yes, ORC-2056.01 |
19 | Magnet cooldown | 9651 | Yes, ORC-2056.01 |
20 | Magnet operations | 10062 | Yes, ORC-2071 |
21 | Magnet fill from commercial LHe Dewar | 10056 | Yes, ORC-2056.01 |
22 | Cold LHe Transfer | 10395 | No |
Procedures related to gases | |||
23 | Pumping and purging (generic) | 10184 | Yes (Rick) |
24 | Leak checking (generic) | 10188 | Yes (Rick) |
25 | Outside gHe tank refill | 10198 | Yes, (Jordan) |
26 | Manually vented He Gas Storage Tank to the Atmosphere | 10285 | No (Sent to Rick) |
27 | Adjusting the Parallel plate valve PSV-401-He | 10333 | Yes (Rick) |
Turning ON/OFF procedures | |||
28 | UVA-NMR system shutdown, startup,tuning, and data-taking | 10367 | No |
29 | Slow Control System turn on/off | 10369 | No |
30 | Annealing System turning on/off | 10372 | No |
31 | Microwave system powering up, Operation, and shutting down | 10387 | No |
32 | Target lifter system powering up and shutting down procedure | 10381 | No |
HDPE Target Material Handling Related (Include Cryogenics) | |||
33 | Handling Target material CH2/CD2 (HDPE) | 10411 | In Progress |
34 | Filling the portable handheld dewar | 10358 | In Progress |
35 | Target material dewar filling from the portable handheld dewar | 10427 | In Progress |
36 | Target insert loading/unloading procedure | 10355 | In Progress |
NH3/ND3 Target Material Handling (Include Cryogenics) | |||
37 | Handling Target material NH3/ND3 | 10360 | In Progress |
38 | Plans for storage and usage of Ammonia for the target | 10414 | In Progress |
Other Maitainance / Cable Installation procedures | |||
39 | Procedure for draining LCW from roots pumps | 10384 | Yes, HA (Rick) |
40 | Cleaning Procedure of roots LCW regulator | 10420 | No |
41 | Oil refilling/changing for rotary vane pump | 10422 | No |
42 | Routing NMR cables | 10357 | Yes, HA |
Planning | |||
43 | A Detailed description of upcoming plan | 10417 | In Progress |
...