The ITS Team will be performing maintenance on Confluence beginning at 6:00 pm Tuesday, October 8. During this time the service may go offline. It should be available again by 8:00 pm. Please refrain from editing pages during this time to avoid losing your work.
...
Higher Level Monitoring (with slow control integration)
- TDC time difference between H2XT and H4XB vs flight distance
- Hit pattern overlap from DC, SHodo and FHodo
- Hodo rates vs High Voltage
- PMT rates vs High Voltage
- DC rates vs High Voltage, current and leak current
- Temperature in analysis magnet and polarity vs hit patterns for +/- muons
- Hit pattern in detectors in comparison to golden hits
- Gas flow pressure with rates
...