Front Penetration (55 ft to cryoplatform) : All other cabling

 

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

West Penetration

-----------------------------------------------------------------------------------------------------------------------------------(Cryo)-------------------------------------------------------

Cryogenics

Vapor return for QT transferline (0.5 inch SS/copper line with 0.5-1 inch foam)

...

He gas (1/8 hose HDPE for gas lines for backfilling fridge)

 

 (

Electrical

...

SuperConducting Magnet Power:

...

SuperConducting Magnet Aperature SensorsThermocouples - Highly Length Sensitive:

    Quantity: 8

    Dimensions (each): 0.055" x 0.090"

...

    Website: https://www.omega.com/en-us/wire-and-cable/thermocouple-and-rtd-wire-and-cable/p/EXTT-TX-WIRE    

 

External magnet sensors TC lines (sixteen 1 mm cables) (highly length sensitive)

LHe level probe (one 7 mm cable)

...

Shim power (two 7 mm cable)

 

 

 

Top ceiling Penetration

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Top ceiling Penetration

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Magnet boil off exhaust (25 mm flex hose with 0.5-1 inch foam) back to QT T-ed outside of cave to Quench relief outside of Hall

LN2 port exhaust (25 mm flex hose with 0.5-1 inch foam) should have a fan pulling vapor

 

 

 

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

East Penetration

East Penetration (less than 47ft from target to cryo-platform)

-----------------------------------------------------

NMR lines <30 mm dim collection of multiple coax (highly length sensitive)

EIP cable 4 mm gore cable

 

 

-----------------------------------------------------------------------------------------------------------------------------

NMR lines - Highly Length Sensitive

    Quantity:

    Diameter (each):

    Diameter (Collective): < 30mm

    Part Number:

 

EIP Microwave Frequency Counter (Gorex):

    Quantity: 1

    Diameter: 0.210"

    Length:

 

-------------------------------------------------------------------------------------------------------------------------------------------------------------------

Top Front-East Penetration

Top Front-East Opening (shortest length is about 55ft from target to cryo-platform)

--------------------------------------------------------------------------------------------------------------------------------------------------------

(Other)

Water lines for Microwave (two 3/8" SS tubing)

-----------

Other

Cooling Water Lines for EIO (microwave) R.A.W.

    Quantity: 2

    Outer Diameter (O.D.): 1/4"

    Inner Diameter (I.D): 11/64"

    Material: High Density Poly Ethylene (HDPE)

    Item Number: 2LZT2

    Website: https://www.grainger.com/product/GRAINGER-APPROVED-100-ft-Natural-Polyethylene-2LZT2

 

Pneumatic air lines (two 3/8" SS HDPE tubing)

 (

Cryo

...

Manometer (25 mm flex hose with 1-2 inch foam)

 (

Electrical

...

Annealing cables (one 7 mm cable)

Power Cables for the Annealing Plates:

    Quantity: 2

    Gauge: 14

    Diameter (with insulation):

    Length: From cave to control room

 

Insert sensors (one 7 mm cable):


Fridge Temperature Sensors (1KOhm RuO):

    Quantity: 8 sensors, 16 wires. Use Multi-conductor

    Diameter (overall):

    Length:

 

(one 7 mm cable)2 pressure sensors cabling (two 7 mm cable)

...

All instrumentation for vacuum turbo will run along this path as well but not through penetration

  

------------------------------------------------------------------------------------------------------------------------------------------------------------------

Bottom Front-East Opening

(To Vacuum setup)

------------------------------------------------------------------------------------------------------------------------------------------------------------------

pfeiffer pressure sensor

turbo pump (KF-25 flex)

...

turbo controller (no penetration)

 

 

-------------------------------------------------------------------------------------------------------------------------------------------------------------------

Connects from Outside of Cave to Cryoplatform

-------------------------------------------------------------------------------------------------------------------------------------------------------------------

HFM-305 flow meter (from inlet manifold to rack)

...

PS AF-100-AM interconnecting cable (100 ft long)

--------------------------------