List of equipment, utilities, staffing and services need from Fermilab for target running and setup:
Target Technician Area:
2
...
benches
...
25"
...
X
...
100"
...
(20
...
X
...
80
...
would
...
be
...
the
...
smallest
...
workable
...
size)
...
space for about five 3'
...
X
...
3'
...
crates
...
space for
...
a
...
set
...
of
...
two tool
...
boxes
...
2'
...
X
...
2'
Wall
...
mounted
...
rack
...
for
...
hanging
...
3-4
...
target
...
inserts
...
: 4"
...
diameter
...
5"
...
top lip
...
and
...
75"
...
long
1 outlet with extension cable for 15A 120 VAC 60 Hz standard US plug: Needed to power varitemp heat gun
...
Two soldering station preferred hot air and iron option (UVA can supply if FNAL can not)
1 single phase (208 VAC) for counting house target area if available
Inside Cave:
4 separate outlets with extension cables for 15A 20A 120 VAC 60 Hz standard US plug: Needed to power varitemp Varitemp heat guns (supplied by FNAL) and leak checker (supplied by FNAL)
On the about multiplex outlet would only work if all 4 15A draws could run simultaneously
...
- Also used with extensions 4 0.25-3A 110-120 VAC 50-60 Hz standard US plug
...
- for readout device and auxiliary testing devices
...
- Multiplex outlet would only work if all 4 15A draws could run simultaneously
Safety setup: lights, ropes and signs for ODH and Magnetic field
At least one single phase 220 V (this is a backup source for testing so may not need permanent installation)
- Power Req: 200-240 V 50/60 Hz (prefer 208 V)
...
Power source for actuator: not yet specified
1 80"X20" in low radiation area but in near proximity to cave for target material changing/loading
Outside Cave:
Air for pneumatic valves (Main Gate Valve, there are two more pneumatic valves outside of cave: turbo and main backing pump)
Chiller water for microwave generator (this is the 1kW (actually 300 W) cooling power needed for the EIO chiller outside the cave)
Outside Cave:
Separator Pump (KNF compressor)
- 115 V AC 880 W 60Hz
Turbo TMU1001 (target magnet insulating vacuum)
- Power supply: 590 W at 120V AC or 900 W at 220 V
- Backing Pump: 110/220V AC 370 W
- Turbo fan 110-120V AC 70 W
500L liquid helium added to liquifier per month
1 kW cooling power for the EIO
20L liquid nitrogen for magnet heat shield per day
3 He4-Gas K 2200psi (99.95%) bottles per weekbottles for gas flow controls
3 Nitrogen Gas K 2200psi bottles for gas flow controls
Liquid nitrogen supply for material handling and storage: 40L/week
...
Deionized water (8 gallons + 1 gallon/week) for chillers used to cool the microwave generator, probably feed in through shielding to protect chiller (source of water should be resistivity at 1 MOHM-cm)
10 outlets with clean power (1mV RMS) and conditioner/surge-protector at 4A 110-120 VAC 50-60 Hz standard US plug (multiplex outlet OK) for NMR all on one isolated circuit with same ground
...