Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

https://epics.anl.gov/docs/USPAS2014/1-Monday/CSS_2_First_Steps.pdf

 

Data inherited from EPICS  and stored as tsv files:

  /data2/e1039_data/slowcontrol_data/

As of 10/23/2020 the following six groups are being saved (and also archived)

  1. Chambers: spill_XXXXXXXX_ChamHv.tsv

  2. Slow control Life scripts:  spill_XXXXXXXX_ReadSlowCont.tsv

  3. Acnet spill_XXXXXXXX_Acnet.tsv

  4. Hall enviroment  spill_XXXXXXXX_HallEnv.tsv

  5. Hodoscopes  spill_XXXXXXXXX_HodoHv.tsv

  6. Dark Photon Hodoscopes spill_XXXXXXXX_DPhodo.tsv


Monitoring Data with CS-Studio:

...

If this becomes a problem I can port several skeleton installations in people's directories with minimal space requirements . If you need this just drop me an email (astrid@lanl.gov)


CS-STUDIO baseline projects

/data2/e1039/daq/slowcontrols/epics/css_projects/CSS/

from the above the following projects have been created:

Hall environment:

HD.plt HH.plt HT.plt P1.plt P.plt T1.plt

Drift Chambers:

D1_V.plt D1_I.plt D2_V.plt D2_I.plt D3_V.plt D3_I.plt

Prop tubes:

P4_V.plt  and P4_i.plt

Hodoscopes:

The following sample projects have been created

LC_H3_EN_HV.plt

LC_CM.plt

X3XT_MV.plt

H3XT_DV.plt

 

Dark Photon Hodoscopes:

These is the most demanding of all detectors with 1192 PV's

We have created the following sample projects:

DP1_LT1_V.plt

DP1_LT1_CH_I.plt

and

DP1_LT1_CH1-10_I.plt which is a subset of DP1_LT1_CH_I.plt


Live  script check:

Scalar DAQ:


Other monitoring pages:

Drift Chambers, page created by Kenichi.

...