Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. HR3 Manual
  2. HMI Interface and Connectivity Manual
  3. Liquefiers (A B) Manual
  4. Purifier Manual
  5. QT System P&ID Information
  6. Coldhead Compressors Manual
  7. HMI Cabinet Manual
  8. Pneumatic Air Supply Manual

Check this page before and after the system is restarted → Operational Configuration

...

Routine Maintenance Procedures

...

  1. The volume of an outside gHe tank: 1600 cubic feet (V = 45306.95 L)
  2. 100 slm rate on Magnet FC is equivalent to ~ 192 LHe liters per day (i.e. assuming both LQ A and B are running)


Useful Contact Information

...