QT Dewar level: Liq B = Warm, pumped, and purged. Flushed out level sensors.  

  1. [MV02 should be set to restrict flow to allow only ~60 SLM; if it is, then the pressure should be able to be regulated in the dewar].. If you cannot adjust that due to NM4 hall restriction due to beam operations, skip step 2. 
  2. The inlet flow should be around 60 slm, and the outlet should be 60 slm. At the beginning of the dewar A/B cooldown, open VJVA/B and VPC ahead of time. 
  3. Dewar setting should be on AUTO+Liquefy mode. The entire flow should be going out through VPC. You can monitor this flow by looking at FMR. 

...