Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. [MV02 should be set to restrict flow to allow only 100 60 SLM; if it is, then the pressure should be able to be regulated in the dewar].
  2. The inlet flow should be around 60 slm, and the outlet should be 60 slm. At the beginning of the dewar A/B cooldown, open VJVA/B and VPC ahead of time.
  3. Dewar setting should be on AUTO+Liquefy mode. The entire flow should be going out through VPC. You can monitor this flow by looking at FMR. 

...