...
- Confirm that the shim PS is powered ON (if you can go in the hall).
- Press "To Zero", to confirm that CCP can communicate with the magnet PS.
- Press the Toggle button of the main switch heater. It turns on the main switch heater and also the two shim switch heaters.
- When you use the PS front panel, you have to press additionally the two buttons of the shim switch heaters on CCP, to turn them on.
- When you use the PS front panel, you have to press additionally the two buttons of the shim switch heaters on CCP, to turn them on.
- Confirm that the two LEDs on the shim PS are ON (if you can go into the hall).
- Set "2 A/m" and "45 A".
- You can use the "Presets" selector, or enter the values into the text boxes.
- You can use the "Presets" selector, or enter the values into the text boxes.
- Press "To Set" and wait until the current becomes the set point (SP) and "HOLD". It takes 23 minutes.
After ~23 minutes. - Set "1 A/m" and "63 A".
- Press "To Set" and wait until the current becomes the SP and "HOLD". It takes 18 minutes.
After ~18 minutes - Set "0.5 A/m" and "74.78 A".
- Press "To Set" and wait until the current becomes the SP and "HOLD". It takes 24 minutes.
After ~24 minutes - Switch to the persistent mode, if you want.
...