Comment: To-do list to the Magnet PS VI

...

The following procedures suppose that you use the remote control interface (i.e. Cryo Control Panel; CCP).  When you use the front panel of the magnet PS, some button operations are different.

Things to-do

  1. We should get the information of Clamped/Reate-Limit/Quench from the Mercury-iPS to the VI
  2. We need to be able to ramp-down 0A with 0.5A/m rate, so there should be a preset for that.
  3. Need a manual override in the VI.
  4. We need a power-indicator on the shim power supply. These are the shim-coil-power indicators.
  5. We need a field indicator in the cave.

Shim Power Supply Manual?

...