  1. Change the separator flow to 20 SLM (from 7 SLM usually).

  2. Wait for 1.5-2.0 hours.
  3. Change the separator flow to 25 SLM.
  4. Change the setting of the gate-valve bypass as follows:
    1. The auto control is disabled.
    2. The absolute valve position is 0.1 05 turns or larger.
  5. Enable the interlock with Heat-Ex Top (on Fridge_Valve_Main.vi).
  6. Open the bypass valve at 2.0 turns.  Confirm that the fridge return flow goes up.

    Go into the cave to fully open the gate-valve bypass

    .

  7. Open the bypass valve at 3.0 turns.
  8. Change the separator flow to 30 SLM.
  9. Wait until the Ann-Plate Top resistor goes up to 1400 Ohm, which indicates that the liquid started accumulating.  It usually takes 30 minutes from step #3.  If it takes longer than 40 minutes, search for unexpected conditions.

  10. Wait until the nose LHe level reaches 100%.  It usually takes 15 minutes from the previous step.
  11. Wait until the Heat-Ex Bottom resistor goes down from 1400 Ohm and then up.  It usually takes 10 minutes from the previous step.
  12. Wait until the Heat-Ex Top resistor goes up to 1400 Ohm, which indicates that the liquid is as high as Heat-Ex Top.  It usually takes 10 minutes from the previous step.

  13. Close the bypass valve.

    1. The Usually the software interlock sets it at 0.5 turns automatically.
    2. You then Anyway you set it at 0.0 turns manually.
  14. Change the separator flow to 7 SLM.

  15. Change the setting of the gate-valve bypass as follows:
    1. The set point for the auto control is 20 40 Torr.
    2. The auto control is enabled.
  16. Make an elog entry to record the time and the mount of this filling.

...