...
Purging the He returning line from HR3 to the tank to HR3:
- Close V14
- Open MV102
- Slowly open V17
- After purging some He from the line, keep V17 opened slightly to have a flow and connect a purity meter to the vent
After purging:
- Close V17
- Close MV102
Purging the He inlet line from the tank to HR3:
- Close MV103
- Purge from MV101