Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Purging the He returning line from HR3 to the tank to HR3:

  1. Close V14
  2. Open MV102
  3. Slowly open V17
  4. After purging some He from the line, keep V17 opened slightly to have a flow and connect a purity meter to the vent

After purging: 

  1. Close V17 
  2. Close MV102

Purging the He inlet line from the tank to HR3:

  1. Close MV103
  2. Purge from MV101