Do Immediately | Additional Information |
---|---|
Fridge sensors | 1KOhm Ruthenium Oxide |
Determine and measure true path for all cables coming from target cave | Front Penetration → Racks on Cryo platform → Counting House Side Penetration → Racks on Cryo platform → Counting House |
Liquid Helium Level Probe mounting clips | Being made at UVa - 7/17/19 |
Replace Black BUNA-N O-rings | Measure existing O-rings and find PTFE (Teflon) equivalents
|
Make and test indium seal on shell/nose | |
Measure distance for NMR hardlines through penetration | From magnet position, through the side penetration down to the floor right outside cave. Multiply this measurement by the number of cables desired (>=12) |
Buy a flaring tool for copper tubing | |
Assemble and test microwave system | Needs to be shipped from UVa - 7/17/19 Borrow gore cable from UVa Need waveguide too |
Get Liverpool NMR Q-meter (and ancillary equipment) from LANL | |
Once EIO arrives, connect EIP and test air core cable | |
Setup sensors on stick | Check with lakeshore |
Stink test in the target loading area | with "special" spray |
Setup and test manometer | |
Setup external magnet sensors | |
Shim Microwave actuator bushings for hard stop and top target |
...