The

...

top

...

mounting

...

plate

...

can

...

be

...

positioned

...

whenever

...

the

...

techs

...

come

...

to

...

do

...

it.

...

The

...

machining

...

and

...

materials

...

from

...

UVA

...

have

...

arrived

...

and

...

are

...

ready.

...

This

...

includes

...

the

...

bottom

...

target

...

tri-winged

...

frame

...

and

...

the

...

new

...

aluminum

...

feet

...

holders.

...

The

...

threaded

...

feet

...

are

...

also

...

finished

...

from

...

FNAL.

...

The

...

dowel

...

pins

...

should

...

be

...

done

...

soon.

...

After

...

this

...

the

...

lifter

...

frame

...

should

...

go

...

in

...

and

...

then

...

the

...

magnet

...

can

...

in

...

principle

...

go

...

into

...

position.

...

In

...

order

...

for

...

us

...

to

...

be

...

ready

...

for

...

that

...

we

...

want

...

new

...

PTFE

...

seals

...

which

...

are

...

more

...

radiation

...

resistant.

...

We

...

need

...

to

...

clean

...

and

...

prep

...

the

...

magnet

...

and

...

can,

...

and

...

to

...

do

...

the

...

dock

...

survey.

 

(See

...

below

...

for

...

survey

...

info)

 

Do ImmediatelyAdditional Information

Fridge sensors

1KOhm Ruthenium Oxide
Determine and measure true path for all cables coming from target cave and order all cable needed

Front Penetration → Racks on Cryo platform → Counting House

Side Penetration → Racks on Cryo platform → Counting House
Liquid Helium Level Probe mounting clipsBeing made at UVa - 7/17/19
Replace Black BUNA-N O-rings

Measure existing O-rings and find PTFE (Teflon) equivalents

  • Run/bypass valves
  • Shell to magnet
  • Shell to turret
  • Turret to fridge
  • Electrical feedthroughs
  • Bottom can
  • Red pop-off valve

Make and test indium seal on shell/nose also setup safety walk through for testing stand vacuum vessel

Setup Operational Readiness Clearance (through Rick)
After replacing seals setup safety walk through withSetup Operational Readiness Clearance (through Rick)
Buy a flaring tool for copper tubing 
Assemble and test microwave system

Needs to be shipped from UVa - 7/17/19

Borrow gore cable from UVa

Need waveguide too

Get Liverpool NMR Q-meter (and ancillary equipment) from LANL 
Once EIO arrives, connect EIP and test air core cable 
Setup sensors on stickCheck with lakeshore
Stink test in the target loading areawith "special" spray
Setup and test manometer 
Setup external magnet sensors with data going into slow controls data stream 
Shim Microwave actuator bushings for hard stop and top target. Microwave table and magnet should be in place and use the information from initial survey to measure 
Things to do when not working on the immediate thingsAdditional Information
  
Setup Target Rack

Stepper motor drives and power supplies

ADC for position readbacks

Microwave EIP

Lakeshore 218 x2

Level Probe Readout

Turbo readout and Controller

IV gauge readout

Teledyne Hastings readout

4He & 3He manometers

Possibly Microwave Power Supply

Target Insert Lakeshore

Fridge Lakeshore

External Magnet Lakeshore

 

Get hoses for microwave (EIO)Either hard plastic or rubber
Target Controls ComputerJosh will find it
All cabling from target to racks and counting houseneed lengths and to order cables
setup target operator station 
setup target loading station 
Finalize NMRtesting still needed
Target handler and alarm system 
Setup NMR VI 
Annealing controls 
Setup and test Main Gate Valve 
Test Air-core cable with EIP/microwave 
Setup Insert and leak check and electronics check, sensors, coils, SMA 
Setup Nuc and oscilloscope and PDP 
Setup Roots stack controller and power 
Get some plastic tubs and foam dewars 

 

For

...

SpinQuest

...

it

...

will

...

be

...

difficult

...

to

...

get

...

the

...

positioning

...

of

...

the

...

target

...

perfectly

...

aligned

...

with

...

the

...

beam.

...

This

...

is

...

because

...

all

...

fiducials

...

that

...

we

...

can

...

get

...

while

...

the

...

system

...

is

...

warm

...

and

...

open

...

will

...

change

...

once

...

we

...

are

...

running

...

with

...

liquid

...

helium.

...

We

...

have

...

X,

...

Y

...

positioning

...

measured

...

from

...

averaged

...

vertex

...

reconstruction

...

but

...

this

...

takes

...

at

...

least

...

1

...

month

...

of

...

data

...

to

...

produce,

...

and

...

this

...

will

...

only

...

give

...

the

...

mean

...

with

...

a

...

very

...

large

...

variance.

...

This

...

means

...

we

...

need

...

to

...

get

...

the

...

information

...

we

...

need

...

from

...

the

...

survey

...

and

...

the

...

final

...

set

...

of

...

surveys

...

will

...

need

...

to

...

contain

...

some

...

cold

...

target

...

information.

...

The

...

precision

...

in

...

the

...

target

...

cell

...

to

...

beamline

...

positioning

...

needs

...

to

...

be

...

good

...

to

...

mitigate

...

large

...

absolute

...

errors

...

while

...

running.

...

This

...

is

...

estimated

...

to

...

be

...

on

...

the

...

sub-millimeter

...

level

...

(based

...

on

...

simulations

...

being

...

confirmed).

...

There

...

are

...

several

...

factors

...

that

...

can

...

lead

...

to

...

false

...

asymmetries

...

relating

...

to

...

this

...

precision.

...

There

...

can

...

be

...

a

...

bias

...

produced

...

in

...

the

...

detector

...

if

...

there

...

the

...

beam

...

is

...

off

...

center.

...

There

...

can

...

be

...

less

...

polarized

...

scattering

...

if

...

the

...

beam

...

is

...

not

...

aligned

...

and

...

missing

...

part

...

of

...

the

...

target

...

(beam

...

profile

...

dependent,

...

also

...

being

...

checked).

...

There

...

can

...

be

...

greater

...

scattering

...

off

...

the

...

aluminum

...

ladder

...

on

...

one

...

side

...

as

...

compared

...

to

...

the

...

other.

...

Most

...

of

...

these

...

manifest

...

from

...

X

...

being

...

off

...

but

...

if

...

Y

...

is

...

off

...

over

...

1

...

mm

...

then

...

the

...

same

...

issues

...

start

...

to

...

manifest

...

with

...

the

...

ladder

...

as

...

well

...

but

...

this

...

may

...

not

...

result

...

in

...

false

...

asymmetry

...

and

...

only

...

result

...

in

...

additional

...

heat

...

load

...

to

...

the

...

coils.

...

During

...

our

...

discussions

...

with

...

the

...

survey

...

crew

...

it

...

was

...

suggested

...

to

...

install

...

transparent

...

windows

...

so

...

we

...

could

...

do

...

an

...

optical

...

survey

...

on

...

the

...

magnet

...

and

...

target

...

cells

...

while

...

cold.

...

This

...

would

...

be

...

great

...

to

...

do

...

but

...

I

...

do

...

not

...

think

...

this

...

is

...

possible

...

at

...

FNAL.

...

I

...

don't

...

believe

...

we

...

would

...

ever

...

pass

...

a

...

safety

...

review

...

to

...

do

...

that.

...

The

...

next

...

best

...

option

...

is

...

to

...

do

...

surveys

...

using

...

liquid

...

nitrogen.

...

We

...

could

...

calculate

...

the

...

level

...

of

...

contraction

...

for

...

both

...

LN2

...

and

...

LHe.

...

We

...

can

...

then

...

measure

...

the

...

contraction

...

during

...

an

...

open

...

system

...

survey

...

with

...

LN2

...

in

...

the

...

magnet

...

and

...

in

...

a

...

nose

...

with

...

a

...

window

...

on

...

it.

...

The

...

set

...

of

...

survey

...

would

...

go

...

like

...

this:

...

 

1.)

...

Survey

...

on

...

dock

...

with

...

fully

...

open

...

system

...

(no

...

nose,

...

no

...

nitrogen

...

shield,

...

no

...

beam

...

windows).

...

Survey

...

the

...

magnet

...

aperture,

...

the

...

target

...

insert

...

along

...

X

...

only,

...

and

...

the

...

outside

...

fiducials

...

(can

...

and

...

top

...

flange).

...

The

...

primary

...

goal

...

of

...

this

...

survey

...

is

...

to

...

generate

...

fiducials

...

on

...

the

...

can

...

and

...

top

...

flange

...

to

...

help

...

align

...

when

...

going

...

into

...

position

...

in

...

the

...

cave.

...

This

...

part

...

of

...

the

...

survey

...

should

...

be

...

able

...

to

...

be

...

measured

...

with

...

error

...

at

...

less

...

than

...

0.5

...

mm.

...

The

...

fiducial

...

on

...

the

...

can

...

is

...

meant

...

to

...

use

...

to

...

align

...

the

...

top

...

and

...

bottom

...

to

...

our

...

best

...

precision.

...

The

...

tolerance

...

of

...

the

...

drawings

...

is

...

0.5

...

mm.

...

 Use

...

the

...

leveling

...

pads

...

to

...

level

...

the

...

magnet

...

on

...

the

...

dock

...

before

...

survey.

...

This

...

survey

...

can

...

be

...

use

...

to

...

check

...

the

...

variation

...

when

...

leveled

...

and

...

re-leveled

...

or

...

if

...

the

...

magnet

...

is

...

plumb

...

not

...

the

...

top

...

flange

...

is

...

slightly

...

off

...

level.

...

Working

...

on

...

the

...

dock

...

for

...

this

...

survey

...

will

...

have

...

the

...

advantage

...

of

...

space

...

unlike

...

in

...

the

...

cave.

...

We

...

can

...

also

...

flip

...

the

...

insert

...

and

...

check

...

target

...

cell

...

up

...

stream

...

and

...

down

...

stream

...

differences.

...

2.)

...

Survey

...

in

...

cave

...

using

...

LN2

...

in

...

nose

...

and

...

magnet.

...

This

...

would

...

be

...

a

...

partly

...

open

...

survey

...

with

...

a

...

special

...

nose

...

put

...

on

...

with

...

transparent

...

windows

...

on

...

either

...

side

...

for

...

optical

...

survey.

...

The

...

nitrogen

...

shield

...

and

...

beam

...

widows

...

on

...

the

...

vacuum

...

are

...

left

...

off

...

for

...

this.

...

This

...

survey

...

in

...

the

...

cave

...

will

...

be

...

of

...

the

...

magnet

...

aperture,

...

the

...

target

...

insert

...

along

...

X,

...

Y,

...

Z,

...

and

...

the

...

outside

...

fiducials

...

(can

...

and

...

top

...

flange

...

and

...

reference

...

locations

...

in

...

the

...

cave).

...

Crosshairs

...

will

...

be

...

use

...

in

...

the

...

front

...

and

...

back

...

of

...

the

...

target

...

cell

...

to

...

help

...

determine

...

degree

...

of

...

twisting

...

in

...

the

...

cell.

...

Cross

...

hairs

...

in

...

the

...

can

...

windows

...

can

...

also

...

be

...

use

...

to

...

set

...

the

...

rotational

...

alignment

...

of

...

the

...

can.

...

The

...

target

...

insert

...

carbon

...

fiber

...

is

...

not

...

expected

...

to

...

contract

...

very

...

much

...

but

...

the

...

aluminum

...

ladder

...

can.

...

The

...

primary

...

goal

...

of

...

this

...

survey

...

is

...

to

...

compare

...

to

...

calculations

...

of

...

contraction

...

and

...

measure

...

positioning

...

of

...

target

...

cell

...

with

...

respects

...

to

...

magnet

...

aperture

...

and

...

also

...

with

...

respect

...

to

...

the

...

beamline.

...

There

...

should

...

be

...

a

...

hard

...

stop

...

setup

...

on

...

the

...

actuator

...

that

...

positions

...

the

...

top

...

target

...

exactly

...

in

...

the

...

beam

...

line

...

(to

...

test

...

repeatability

...

of

...

the

...

string

...

potentiometer

...

and

...

gears).

...

We

...

also

...

need

...

to

...

take

...

the

...

stick

...

out

...

and

...

few

...

times

...

and

...

test

...

the

...

deviation in reproducibility in target cell shifts and bends.
This will take two surveys to do since we will need to machine the piece for
this hard stop after this first cold survey measurement.  In order to do this
the actuator and motor should be installed so we can move up and down with
reasonable repeatability.  This repeatability can also be tested during this survey.

...

scale of  deviation in reproducibility in target cell shifts and bends. This will take two surveys to do since we will need to machine the piece for this hard stop after this first cold survey measurement. In order to do this the actuator and motor should be installed so we can move up and down with reasonable repeatability. This repeatability can also be tested during this survey. The drawings indicate a change of 4.5 mm up when cold.

3.)

...

Put

...

in

...

hard

...

stops

...

and

...

re-survey.

...

This

...

will

...

be

...

adding

...

a

...

shim

...

to

...

the

...

hard

...

stop

...

that

...

already

...

exists.

...

Here

...

we

...

can

...

have

...

the

...

goal

...

of

...

.25

...

mm

...

target

...

centering

...

in

...

X,Y

...

and

...

measure

...

a

...

set

...

of

...

cells

...

using

...

cross

...

hairs

...

in

...

Z.

...

4.)

...

An

...

X-ray

...

survey

...

while

...

cold

...

would

...

be

...

the

...

next

...

step

...

if

...

possible.

...

We

...

may

...

not

...

needed

...

it

...

if

...

we

...

achieve

...

good

...

results

...

from

...

the

...

first

...

3.

...

It

...

may

...

also

...

be

...

possible

...

to

...

use

...

phosphine

...

graph

...

paper

...

to

...

check

...

beam

...

position

...

on

...

a

...

special

...

target

...

insert

...

without

...

depending

...

on

...

the

...

magnet

...

or

...

nose

...

having

...

LHe

...

in

...

them.

...

 Or use

...

something

...

that

...

discolors

...

or

...

burns

...

in

...

the

...

beam

...

so

...

we

...

can

...

make

...

an

...

insert that will be use over the experiment to check position.