Do Immediately | Additional Information | ||
---|---|---|---|
Fridge sensors | 1KOhm Ruthenium Oxide | ||
Determine and measure true path for all cables coming from target cave and order all cable needed | Front Penetration → Racks on Cryo platform → Counting House Side Penetration → Racks on Cryo platform → Counting House | ||
Liquid Helium Level Probe mounting clips | Being made at UVa - 7/17/19 | ||
Replace Black BUNA-N O-rings | Measure existing O-rings and find PTFE (Teflon) equivalents
| Make and test indium seal on shell/nose also setup safety walk through for testing stand vacuum vessel | Setup Operational Readiness Clearance (through Rick)|
After replacing seals setup safety walk through with | Setup Operational Readiness Clearance (through Rick) | ||
Buy a flaring tool for copper tubing | |||
Assemble and test microwave system | Needs to be shipped from UVa - 7/17/19 Borrow gore cable from UVa Need waveguide too | ||
Get Liverpool NMR Q-meter (and ancillary equipment) from LANL | |||
Once EIO arrives, connect EIP and test air core cable | |||
Setup sensors on stick | Check with lakeshore | ||
Stink test in the target loading area | with "special" spray | ||
Setup and test manometer | |||
Setup external magnet sensors with data going into slow controls data stream | |||
Shim Microwave actuator bushings for hard stop and top target. Microwave table and magnet should be in place and use the information from initial survey to measure |
...