Do Immediately | Additional Information |
---|---|
Fridge sensors | 1KOhm Ruthenium Oxide |
Determine and measure true path for all cables coming from target cave and order all cable needed | Front Penetration → Racks on Cryo platform → Counting House Side Penetration → Racks on Cryo platform → Counting House |
Replace Black BUNA-N O-rings | Measure existing O-rings and find PTFE (Teflon) equivalents
|
After replacing seals setup safety walk through with | Setup Operational Readiness Clearance (through Rick) |
Buy a flaring tool for copper tubing | |
Assemble and test microwave system | Needs to be shipped from UVa - 7/17/19 Borrow gore cable from UVa Need waveguide too |
Get Liverpool NMR Q-meter (and ancillary equipment) from LANL | Once EIO arrives, connect EIP and test air core cable |
Setup temp full microwave system for testing here | |
Setup sensors on stick | Check with lakeshore |
Stink test in the target loading area | with "special" spray |
Setup and test manometer | |
Setup external magnet sensors with data going into slow controls data stream | |
Shim Microwave actuator bushings for hard stop and top target. Microwave table and magnet should be in place and use the information from initial survey to measure | |
Setup LANL NMR system for testing in counting house target area | |
Setup UVA NMR system for testing in counting house target area |
Things to do when not working on the immediate things | Additional Information |
---|---|
Setup Target Rack | Stepper motor drives and power supplies ADC for position readbacks Microwave EIP Lakeshore 218 x2 Level Probe Readout Turbo readout and Controller IV gauge readout Teledyne Hastings readout 4He & 3He manometers Possibly Microwave Power Supply Target Insert Lakeshore Fridge Lakeshore External Magnet Lakeshore
|
Get hoses for microwave (EIO) | Either hard plastic or rubber |
Target Controls Computer | Josh will find it |
All cabling from target to racks and counting house | need lengths and to order cables |
setup target operator station | |
setup target loading station | |
Finalize NMR | testing still needed |
Target handler and alarm system | |
Setup NMR VI | |
Annealing controls | |
Setup and test Main Gate Valve | |
Test Air-core cable with EIP/microwave | |
Setup Insert and leak check and electronics check, sensors, coils, SMA | |
Setup Nuc and oscilloscope and PDP | |
Setup Roots stack controller and power | |
Get some plastic tubs and foam dewars |
...