Please keep a running tab of all things to do in the foreseeable future. Lets keep things moving and make the most of our time at Fermilab. Anyone can add tasks here. Once a task is complete please remove it from the list here and my an entry in the ECL logbook about that task being complete. If you purchased and received the item list in the ECL where it will be stored.
Do Immediately | Additional Information |
---|
Fridge sensors | 1KOhm Ruthenium Oxide |
Determine and measure true path for all cables coming from target cave and order all cable needed | Front Penetration → Racks on Cryo platform → Counting House Side Penetration → Racks on Cryo platform → Counting House |
Replace Black BUNA-N O-rings | Measure existing O-rings and find PTFE (Teflon) equivalents - Run/bypass valves
- Shell to magnet
- Shell to turret
- Turret to fridge
- Electrical feedthroughs
- Bottom can
- Red pop-off valve
|
After replacing seals setup safety walk through with | Setup Operational Readiness Clearance (through Rick) |
Buy a flaring tool for copper tubing | |
Assemble and test microwave system | Needs to be shipped from UVa - 7/17/19 Borrow gore cable from UVa Need waveguide too |
Get Liverpool NMR Q-meter (and ancillary equipment) from LANL | |
Setup temp full microwave system for testing here | |
Setup sensors on stick | Check with lakeshore |
Stink test in the target loading area | with "special" spray |
Setup and test manometer | |
Setup external magnet sensors with data going into slow controls data stream | |
Shim Microwave actuator bushings for hard stop and top target. Microwave table and magnet should be in place and use the information from initial survey to measure | |
Setup LANL NMR system for testing in counting house target area | |
Setup UVA NMR system for testing in counting house target area | |
...