DOE guide for Hazards Analysis: DOE-HDBK-1163-2020_Integration_of_Hazard_Analysis.pdf
Please follow the instructions : How to write a FNAL Procedure
HAs
- HA-LN2-Fill-Magnet-Shield-using-portable-dewar_final.docx
- HA-QT-Coldheads.docx and HA-QT-Coldheads_final.pdf
- HA-QT-Purifier.pdf
- HA_For_Draining_LCW_at_RootsPumps.pdf
- HA-Helium-transfer-from-Commercial-Dewar-in-cave.pdf
- HA_LHe_transfer_to_QT_storage_dewars.pdf
- HA_Filling_LN2_to_Purifier_with_Portable_Dewar.pdf
- HA-Helium-transfer-from-Commercial-Dewar-in-cave_signed.pdf
- MFC_SwapOut_QT_outlet.pdf
Link to IMPACT-tool: https://www-esh.fnal.gov/pls/apex/f?p=129:1:12952119108779::::: View file name Target_HA_ORC_Procedures.pdf height 250
DOE guide for Hazards Analysis: DOE-HDBK-1163-2020_Integration_of_Hazard_Analysis.pdf
Please follow the instructions : How to write a FNAL Procedure
Cryogenics on the cryoplatform | ||||||
1 | QT Purifier LN2 fill | 10337 | Yes (Jordan) | |||
2 | QT Liquefier Dewar level cleaning and Dewar cleaning | 10401 | In Progress | |||
3 | Dewar evacuation | 10178 | Yes, HA | |||
4 | Cold-heads warm-swap procedure | 10378 | Yes, HA | |||
5 | Filling Purifier LN2 space using portable LN2 Dewar | 10053 | Yes, HA (Jordan) | |||
6 | LHe transfer to QT storage dewars | 10389 | Yes, HA | |||
7 | UVA-QT Purifier Helium Space Cleaning Procedure | 10404 | Yes | |||
8 | UVA-QT Purifier LN2 Space Cleaning Procedure | 10407 | Yes | |||
9 | Helium boiloff capture procedure | 10282 | In Progress | |||
10 | LHe transfer using commercial LHe Dewar in the cave | 9670 | Yes, HA (Rick) | |||
11 | Installation of a transfer stinger to a Liquid Helium Dewar (generic) | 10392 | No | |||
QT System Non-Cryogenics | ||||||
12 | QT system startup and shutdown | 10364 | No | |||
13 | HR3 Compressor Oil, Oil filter replacement | 10320 | No | |||
In-cave Cryogenics | ||||||
14 | Magnet LHe fill | 9670 | Cryogenics on the cryoplatform | |||
1 | QT Purifier LN2 fill | 10337 | Yes (Jordan) | |||
2 | QT Liquefier Dewar level cleaning and Dewar cleaning | 10401 | In Progress | |||
3 | Dewar evacuation | 10178 | Yes, HA | |||
4 | Cold-heads warm-swap procedure | 10378 | Yes, HA | |||
5 | Filling Purifier LN2 space using portable LN2 Dewar | 10053 | Yes, HA (Jordan) | |||
6 | LHe transfer to QT storage dewars | 10389 | Yes, HA | |||
7 | UVA-QT Purifier Helium Space Cleaning Procedure | 10404 | Yes | |||
8 | UVA-QT Purifier LN2 Space Cleaning Procedure | 10407 | Yes | |||
9 | Helium boiloff capture procedure | 10282 | In Progress | |||
10 | LHe transfer using commercial LHe Dewar in the cave | 9670 | Yes, HA (Rick) | |||
11 | Installation of a transfer stinger to a Liquid Helium Dewar (generic) | 10392 | No | QT System Non-Cryogenics | ||
12 | QT system startup and shutdown | 10364 | No | |||
13 | HR3 Compressor Oil, Oil filter replacement | 10320 | No | In-cave Cryogenics | ||
14 | Magnet LHe fill | 9670 | Yes, ORC-2056.01 | |||
15 | Magnet shield LN2 fill | 10337 | Yes, (Jordan) | |||
16 | Fridge LHe fill | 10375 | Yes, ORC-2056.01 | |||
17 | Filling magnet shield with portable LN2 Dewar | 10053 | Yes, HA | |||
18 | Magnet pre-cool | 10032 | Yes, ORC-2056.01 | |||
19 | Magnet cooldown | 9651 | Yes, ORC-2056.01 | |||
2015 | Magnet operations shield LN2 fill | 1006210337 | Yes, ORC-2071(Jordan) | |||
16 | Fridge LHe fill | 10375 | 21 | Magnet fill from commercial LHe Dewar | 10056 | Yes, ORC-2056.01 |
22 | Cold LHe Transfer | 10395 | No | Procedures related to gases | ||
17 | Filling magnet shield with portable LN2 Dewar | 10053 | Yes, HA | |||
18 | Magnet pre-cool | 10032 | Yes, ORC-2056.01 | |||
19 | Magnet cooldown | 9651 | Yes, ORC-2056.01 | |||
20 | Magnet operations | 10062 | Yes, ORC-2071 | |||
21 | Magnet fill from commercial LHe Dewar | 10056 | Yes, ORC-2056.01 | |||
22 | Cold LHe Transfer | 10395 | No | |||
Procedures related to gases | ||||||
23 | Pumping and purging (generic) | 10184 | ||||
23 | Pumping and purging (generic) | 10184 | Yes (Rick) | |||
24 | Leak checking (generic) | 10188 | Yes (Rick) | |||
25 | Outside gHe tank refill | 10198 | Yes, (Jordan) | |||
26 | Manually vented He Gas Storage Tank to the Atmosphere | 10285 | No (Sent to Rick) | |||
27 | Adjusting the Parallel plate valve PSV-401-He | 10333 | Yes (Rick) | Turning ON/OFF procedures | ||
28 | UVA-NMR system shutdown,startup,tuning, data-taking | 10367 | No | |||
29 | Slow Control System turn on/off | 10369 | No | |||
30 | Annealing System turning on/off | 10372 | No | |||
31 | Microwave system powering up, Operation, and shutting down | 10387 | No | |||
32 | Target lifter system powering up and shutting down procedure | 10381 | No | HDPE Target Material Handling Related (Include Cryogenics) | ||
24 | Leak checking (generic) | 10188 | Yes (Rick) | |||
25 | Outside gHe tank refill | 10198 | Yes, (Jordan) | |||
26 | Manually vented He Gas Storage Tank to the Atmosphere | 10285 | No (Sent to Rick) | |||
27 | Adjusting the Parallel plate valve PSV-401-He | 10333 | Yes (Rick) | |||
Turning ON/OFF procedures | ||||||
28 | UVA-NMR system shutdown,startup,tuning, data-taking | 10367 | No | |||
29 | Slow Control System turn on/off | 10369 | No | |||
30 | Annealing System turning on/off | 10372 | No | |||
31 | Microwave system powering up, Operation, and shutting down | 10387 | No | |||
32 | Target lifter system powering up and shutting down procedure | 10381 | No | |||
HDPE Target Material Handling Related (Include Cryogenics) | ||||||
33 | Handling Target material CH2/CD2 (HDPE) | 10411 | In Progress | |||
34 | Filling the portable handheld dewar | 10358 | In Progress | |||
35 | Target material dewar filling from the portable handheld dewar | 10427 | In Progress | |||
36 | Target insert loading/ | |||||
33 | Handling Target material CH2/CD2 (HDPE) | 10411 | In Progress | |||
34 | Filling the portable handheld dewar | 10358 | In Progress | |||
35 | Target material dewar filling from the portable handheld dewar | 10427 | In Progress | |||
36 | Target insert loading/unloading procedure | 10355 | In Progress | |||
NH3/ND3 Target Material Handling (Include Cryogenics) | ||||||
37 | Handling Target material NH3/ND3 | 10360 | In Progress | |||
38 | Plans for storage and usage of Ammonia for the target | 10414 | In Progress | |||
Other Maitainance / Cable Installation procedures | ||||||
39 | Procedure for draining LCW from roots pumps | 10384 | Yes, HA (Rick) | |||
40 | Cleaning Procedure of roots LCW regulator | 10420 | No | |||
41 | Oil refilling/changing for rotary vane pump | 10422 | No | |||
42 | Routing NMR cables | 10357 | Yes, HA | |||
Planning | ||||||
43 | A Detailed description of upcoming plan | 10417 | In Progress |
...
- QT system shutdown and restart procedure: Shut Down and Restart Procedures
- Slow control rack shutdown and restart procedure: https://confluence.its.virginia.edu/display/twist/Slow+Controls
- Magnet rack shutdown and restart procedure: https://confluence.its.virginia.edu/display/twist/Magnet+Rack
- Target computer shutdown and restart procedure: https://confluence.its.virginia.edu/display/twist/Target+Computer+setup+at+NM4
- Insulation Vacuum (IVC) pump down procedure
Link to IMPACT-tool: https://www-esh.fnal.gov/pls/apex/f?p=129:1:12952119108779:::::
HAs
- HA-LN2-Fill-Magnet-Shield-using-portable-dewar_final.docx
- HA-QT-Coldheads.docx and HA-QT-Coldheads_final.pdf
- HA-QT-Purifier.pdf
- HA_For_Draining_LCW_at_RootsPumps.pdf
- HA-Helium-transfer-from-Commercial-Dewar-in-cave.pdf
- HA_LHe_transfer_to_QT_storage_dewars.pdf
- HA_Filling_LN2_to_Purifier_with_Portable_Dewar.pdf
- HA-Helium-transfer-from-Commercial-Dewar-in-cave_signed.pdf