- Pumping and purging (generic) procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10184
- Leak checking procedure:https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10188
- Dewar evacuation procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10178
- Cooldown procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=9651
- Target Superconducting Magnet Operations Procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10062
- Fill from Commercial LHe Dewar Procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10056
- Liquid Helium fill procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=9670
- Liquid Nitrogen fill procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10053
- Target magnet pre-cool procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10032
- Target change procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=3043
- gHe filling procedure (outside tanks): https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10198
- LN2 filling (to Purifier and to the Magnet shield) using outside LN2 tank : https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10337
No | Procedure | Docdb ID |
1 | QT system startup and shutdown | 10364 |
2 | Pumping and purging (generic) | 10184 |
3 | Leak checking (generic) | 10188 |
4 | Dewar evacuation | 10178 |
5 | QT Purifier LN2 fill | 10337 |
6 | Magnet pre-cool | 10032 |
6 | Magnet cooldown | 9651 |
7 | Magnet operations | 10062 |
8 | Magnet fill from commercial LHe Dewar | 10056 |
9 | Magnet LHe fill | 9670 |
10 | Magnet LN2 fill | 10337 |
11 | Target material change | 3043 |
12 | Outside gHe tank refill | 10198 |
13 | Routing NMR cables | 10357 |
14 | UVA-NMR system shutdown,startup,tuning, data-taking | 10367 |
15 | Material handling procedure | 10360 |
16 | Slow Control System | 10369 |
17 | Annealing System | 10372 |
18 | Adjusting the Parallel plate valve PSV-401-He | 10333 |
19 | Fridge LHe fill | 10375 |
20 | Filling magnet shield with portable LN2 Dewar | 10053 |
21 | Manually vented He Gas Storage Tank to the Atmosphere | 10285 |
22 | Leak Checking in the Cave (Target Magnet) | 10308 |
23 | HR3 Compressor Oil, Oil filter replacement | 10320 |
24 | QT Transfer line temperature before Cool down phase | 10328 |
25 | Helium boiloff capture procedure | 10282 |
26 | Handling Target material | 10360 |
27 | Filling the portable handheld dewar | 10358 |
28 | Cold-heads warm-swap procedure | 10378 |
29 | Target lifter system powering up and shutting down procedure | 10381 |
30 | Filling Purifier LN2 space using portable LN2 Dewar | 10053 |
31 | Procedure for draining LCW from roots pumps | 10384 |
32 | LHe transfer using commercial LHe Dewar in the cave | 9670 |
33 | Microwave system powering up, Operation, and shutting down procedure (Hall and Counting house) | 10387 |
34 | LHe transfer to QT storage dewars | 10389 |
35 | Installation of a transfer stinger to a Liquid Helium Dewar (generic) | 10392 |
36 | Cold LHe Transfer | 10395 |
Not yet on docdb
- QT system shutdown and restart procedure: Shut Down and Restart Procedures
- Slow control rack shutdown and restart procedure: https://confluence.its.virginia.edu/display/twist/Slow+Controls
- Magnet rack shutdown and restart procedure: https://confluence.its.virginia.edu/display/twist/Magnet+Rack
- Target computer shutdown and restart procedure: https://confluence.its.virginia.edu/display/twist/Target+Computer+setup+at+NM4
- Insulation Vacuum (IVC) pump down procedure
...